Company / People / Purpose

The people behind the infrastructure.

SmartTec is developing data-center services on a 39.39-acre campus in Mead, Oklahoma: shared inference and dedicated GPU servers on SmartTec-owned hardware, alongside colocation for customer-owned equipment.

SMARTTEC / BLENDER SPATIAL STUDYCAMPUS EXPLORER

SmartTec.dev LLC, under SmartTec Holdings LLC, is developing its Mead campus under a management-reported signed 50-year site-use agreement with BC LLC, the related-party landowner.

Illustrative overlay
Explore in 3D

Explore our campus in Blender.

Blender campus design study · Proposed facilities, not a photograph or surveyed site plan.

The approved Blender spatial study connects proposed compute, manufacturing and future energy development. These uses have separate delivery stages; the visualization does not establish construction or readiness.

Company
SmartTec.dev LLC Operating under SmartTec Holdings LLC
Parent company
Z1Power Battery production and energy expertise
Campus
39.39 acres Mead, Oklahoma
Compute proposal
64 B300 GPUs · proposed Eight Supermicro systems · proposed fleet

01Our focus

A practical starting point for AI infrastructure

SmartTec is developing its first campus at 8460 US Highway 70, Mead, OK 73449. Buildings A and C provide 5,035 sq ft of gross building area for data-center development. Building B supports batteries, utilities and storage. The initial proposal is 64 B300 GPUs in 8 Supermicro systems. The new campus study illustrates direct liquid cooling in A and C, with final equipment selection and measured fit-out subject to design.

Each planned service starts with workload, power, cooling, connectivity and tenancy requirements, followed by an agreed installation and service plan. The launch uses grid power, with solar and BESS as a separate later investment. The fleet is proposed; customer availability follows procurement, fit-out and commissioning.

Published model 14 September management target · v6.1.1 cost basis retains an air-cooled, one-building financial baseline. The approved campus experience illustrates a proposed direct-liquid design across Buildings A and C; it requires updated equipment quotes, engineering and repricing before it is included financially. Explore the campus study →

BC LLC, management-reported landowner. Management reports a signed 50-year site-use agreement for SmartTec with BC LLC, a related party. The agreement and title records remain subject to document review; land ownership is not attributed to SmartTec.

02Energy and compute

Connected by a shared campus plan

SmartTec.dev LLC operates under SmartTec Holdings LLC. Z1Power is the parent company and battery producer. Its energy expertise connects SmartTec's compute deployment with the longer-term battery, solar and manufacturing plan.

Data-center services

SmartTec-owned hosting through shared inference or dedicated single-tenant GPU servers, plus colocation for customer-owned equipment. Allocation and service terms follow validation.

Explore the compute plan →

Energy infrastructure

Grid power first, with shared OG&E service and all-new cooling to validate. Solar and BESS are a later investment with a separate operating and capital case.

See power and cooling →

Campus development

Existing buildings anchor the first phase. Planned inverter and battery assembly, solar and storage progress through separate development milestones.

Explore Site 01 →

03Our team

Leadership, operations and advisors

The people connecting energy, technology and the delivery of SmartTec's first campus.

Communications

Ali Askari

Graphics and Media Relations

Legal

Ken

Legal

04Start a conversation

Bring us the workload you want to run

Contact Yasir at yasir@smarttec.dev to discuss your deployment, arrange a site visit or connect with the team.