SmartTec by Z1Power Back to SmartTec

01 / THE DETAILS

Your organization

Let’s start with who you are and how we can reach you.

* Required. Everything else can wait.

Use an address where we can reach you about the site.

Add more details Optional · 3 questions

02 / THE DETAILS

What you want to build

Tell us your goal. You do not need an equipment list to get started.

* Required. Everything else can wait.

A node means one complete server, not one GPU. Enter a whole number if known.

Your requested rack count; physical fit and load still need review.

Optional. Include the exact server model or attach the manufacturer specification.

Add more details Optional · 11 questions

IT equipment load only. Cooling and facility overhead are additional.

Future phase only; not included in initial rack count.

Local businesses, artificial-intelligence start-ups, a specific anchor tenant you already have.

Kilowatts and contract length, if any.

Optional. We can help assess feasible IT capacity after reviewing power, cooling and the building.

A planning preference; cooling method depends on the selected hardware and engineering.

A design goal, not a certification or availability guarantee.

Internet, remote hands, managed hosting, none.

03 / THE DETAILS

Site and building

A few details about the property help us understand the possibilities.

* Required. Everything else can wait.

Filled from a recognized address when possible; you can correct it.

Optional. Narrows utility suggestions; enter the county if your address was typed manually.

Approximate figures are fine. Leave blank if unknown or land only.

Add more details Optional · 10 questions

Steel frame, tilt-up concrete, masonry, wood.

Measured floor-to-obstruction height, if known. Leave blank if the site is land only.

Approximate square feet, and whether equipment may go on the roof or must sit on the ground.

Yes, no, size.

Type, age, tonnage.

Fenced, gated, cameras, 24-hour access.

04 / THE DETAILS

Electrical power at the site

Share what you know. Please do not open electrical panels or approach energized equipment to complete this form.

This section is optional. Leave anything unknown blank.

Suggestions use EIA 2025 county/state records, not parcel-level service verification. Select your utility or type its name from your bill.

For example 1,200 A or 3,000 A. Leave blank if unknown.

Add more details Optional · 8 questions

And average monthly use in kilowatt-hours, if known.

Kilowatts available, cost and lead time, if you have asked.

05 / THE DETAILS

Backup power and energy

Existing equipment and your backup goals help shape the energy plan.

This section is optional. Leave anything unknown blank.

Kilowatt rating, fuel type, age, hours.

Kilovolt-ampere rating, age.

Add more details Optional · 3 questions

Yes or no; pressure and pipe size if known.

06 / THE DETAILS

Cooling and water

Choose a starting approach. The York closed-loop options reflect the SmartTec Mead planning approach; final sizing follows your equipment and site conditions.

This section is optional. Leave anything unknown blank.

Preference only. York model, condenser type and electrical requirements are confirmed from the selected equipment quote.

Liquid-cooled servers can still need room cooling for equipment heat not captured by the liquid loop.

Optional. Attach the quote or datasheet. A prior SmartTec price is not a customer quote.

Add more details Optional · 12 questions

A standby chiller alone does not establish whole-system redundancy.

If known, include units and whether these apply to the facility loop or server loop. Do not guess.

Existing rack voltage does not establish chiller voltage, breaker size or starting requirements.

07 / THE DETAILS

Internet and fiber

Start with your current provider. Technical details are optional.

This section is optional. Leave anything unknown blank.

Search common U.S. providers or type a local carrier. Listing does not establish service availability.

A second provider does not by itself establish a physically diverse route.

Add more details Optional · 5 questions

Basic internet, carrier-neutral choice, direct cloud connection.

08 / THE DETAILS

Zoning, permits and compliance

Share any approvals or constraints you already know about.

This section is optional. Leave anything unknown blank.

Add more details Optional · 4 questions

Previous industrial use, underground tanks, asbestos, remediation.

Service organization control type 2, health-care privacy, payment card, none known.

09 / THE DETAILS

Location risks

Choose “Unknown” when you have not checked. These answers guide further review.

This section is optional. Leave anything unknown blank.

Site is inside a 100-year or 500-year flood plain
Within 1 mile of a railroad, major highway, or airport approach path
Within 1 mile of a chemical plant, refinery, pipeline, or other hazardous facility
History of tornado, hurricane, wildfire or earthquake damage in the area
Utility outages longer than 4 hours in the last 3 years
Known structural issues
Neighbor, community or municipal opposition anticipated

10 / THE DETAILS

Timeline and budget

Your timing and budget help us plan a practical next step.

This section is optional. Leave anything unknown blank.

Add more details Optional · 5 questions

Engineering, equipment, deposits.

Engineer, electrician, broker.

11 / SUPPORTING MATERIAL

A picture helps.

Add documents you already have. You can also submit without attachments and arrange to share them later.

Up to 5 files, 8 MB total. PDF, JPG, PNG, HEIC, DWG, DXF, XLSX or DOCX. Files go to SmartTec through FormSubmit when you submit; they are not embedded in your PDF.

    What documents are helpful?
    • Last 12 months of electricity bills, or a utility usage report
    • Photo of the main electrical panel nameplate and the utility meter
    • Photo of the switchgear room and any generator or battery equipment
    • Building floor plan or site plan, any format
    • Photos of the proposed data hall showing ceiling height and floor
    • Photos of the outdoor area where equipment could be placed
    • Utility correspondence about available capacity or upgrades
    • Existing engineering reports: structural, electrical, environmental
    • Internet or fiber service agreements in place
    • Zoning letter or certificate of occupancy

    Remove account numbers, access codes and other sensitive details before uploading. For confidential plans, contact us to arrange a suitable sharing method.

    12 / READY WHEN YOU ARE

    Your site, at a glance.

    Review your answers. Download a PDF for your records, or submit your site to SmartTec.

    Answers stay in this page while you move between steps. Download a PDF before closing or refreshing.